Mistake #1: Failing to Use a Qualified Casework Installer
A poor installation can ruin even the best products. A successful casework project has both quality products and professional installation.
Mistake #2: Overlooking Need to Coordinate Work of All Trades
Lab casework scope typically includes sink, fixtures, gas, and electrical outlets. Coordination begins with high-quality drawings and culminates in the cooperation between all trades—plumbing, electrical, mechanical, and casework.
Mistake #3: Installing Cabinets Too Soon
If the job site is not ready, casework is subject to damage from other trades and conditions such as heat and humidity. Progress must be monitored to ensure the site is conducive to casework installation by confirming the installed and balanced HVAC, installed ceilings, installed floors, and completed painting (except touch-up coat).
Bottom Line:
Avoid common mistakes and costly change orders by getting Varia involved in the design of your next lab project. The sooner the better!